image

TNEB – liaisoning for obtaining load sanction and power connection form 11KV to 230 KV CEIG / CEA – preparation of drawings as per the requirement of CEIG / CEA authorities, obtaining approval, -preparation / submission of completion report arranging inspection with CEIG / CEA authorities, obtaining safety / energization certificates.

We can also arrange site visits and permission of Electrical Inspector for installation, erection and allied services for electrical system .

The Liaisoning services include obtaining of load approval / Power sanctions from electricity Boards / PWD for both HT & LT and obtaining Electrical safety License from Electrical Inspector for Transformer, High rise buildings, Escalators, Lifts, DG sets etc.

Statutory Liaisoning approvals

  • Liaisoning with TANGEDCO for obtaining Load Sanction for HT & LT Installations.
  • Liaisoning with CEIG for Drawing Approval & Safety Certificates.
  • Liaisoning for Routine Inspections from CEIG.
  • Liaisoning with CEA for necessary Approvals.
  • Generator Registration.
  • Lift installation and Renewal of license for working of lift & its approval.
  • Operation and Maintenance.

Call us for Free Consultation

Reach out with your requirements, one of our advisors shall provide you with expert guidance on anything related to electricals.